Taking the assembly of 5000 Huajia pipeline connectors on roll on/roll off ships built by Chinese shipyards as an example, a comparison is made between the assembly of Huajia connectors and flanges in terms of various main indicators: (see Table 1 below)

Table 1 Comparison indicators of Huajia pipeline connectors and flanges used in a 2000 meter lane roll on/roll off ship:

Indicator

2000Rice lane roll onBoatSelectSelect2.0MpaThe following pressure pipes have a diameter of >DN20mm

Carbon steel flange connection (including bolts and washers)

HuaJiaGLType connector

Estimated quantity

5000Facing flange

5000Only connectors

Space

Huajia pipeline connectors are better than flange jointsProvince50%The above spaces

Advantages

Using pipeline connectors can increase effective space and facilitate alignment with equipment and pipelines

Weight

Approximately40Tons

Approximately10Tons

Advantages

The use of Huajia pipeline connectors can reduce the weight of the ship and increase the effective load capacity for shipowners

Installation requirements

Installation requirements are high and labor-intensive

Easy to install and time-saving

Estimated working hours

1250 working hours

42 working hours

Advantages

The use of connectors can shorten the construction cycle, reduce labor and material input, and save costs for shipyards

Construction investment

Approximately39510000

About40010000

Result

Slow delivery of ships (affecting shipyard revenue)

Shipping can be delivered in advance

Subsequent maintenance

Regular maintenance

Maintenance-free

Maintenance status

During maintenance, flanges and accessories cannot be reused

Access to maintenance connectors can be reused

Impact resistance

Poor vibration resistance and possible leakage

Flexible sealing connection, good impact and vibration resistance

Advantages

Using connectors to improve ship reliability and reduce additional maintenance costs for shipowners during operation

Based on the service life of the ship being 20-25 years, the pipelines on board need to be replaced every 3 to 5 years. The value of existing pipeline connectors that can be reused after replacement is extremely low. If they are replaced every 5 years, it means that the pipeline needs to be invested 4-5 times. However, using Huajia pipeline connectors is designed according to the full life of the ship and can be reused, so investing once is sufficient. It can be clearly seen from Table 5 that using Huajia pipeline connectors has saved a lot of costs, and its economy is clear at a glance. At the same time, when replacing the ship's piping system, due to the lack of gas cutting and its own reusability, it is both safe and saves time, allowing the ship to enter the operating state quickly.